Completed Projects

Pharmaceutical & Medical Industries


Purified Water, WFI, and PS

2021

  • 3,000 L/hr Pretreatment System c/w fully automated Softener Regeneration.
  • 10,000 L/hr Pretreatment System c/w fully automated Softener Regeneration.
  • 500 L/hr Purified Water Generation System (ROEDI) c/w fully automated HEAT Sanitization with enhanced recovery.
  • 700 L/hr Purified Water Generation System (ROEDI) c/w fully automated HEAT Sanitization with enhanced recovery
  • 1,000 L/hr Purified Water Generation System (ROEDI) c/w fully automated HEAT Sanitization with enhanced recovery.
  • 1,500 L/hr Purified Water Storage and Distribution System c/w fully automated HEAT Sanitization.
  • 5,000 L/hr Purified Water Storage and Distribution System c/w fully automated HEAT Sanitization.
  • 13,000 L/hr Purified Water Storage and Distribution System c/w fully automated HEAT Sanitization AND OZONE Sanitization.
  • 13,000 L/hr continuous OZONE Sanitization system.
  • 350m Purified Water Distribution Loop c/w 8 users points c/w fully automated ON/OFF interlocking with CQA Distribution Loop System
  • 250m Purified Water Distribution Loop c/w 8 users points c/w fully automated ON/OFF interlocking with CQA Distribution Loop System
  • 500m Purified Water Distribution Loop c/w 8 users points c/w fully automated ON/OFF interlocking with CQA Distribution Loop System.

2020 and before …

  • 2019 : 13,000 L/hr WFI Storage and Distribution System @ 80oC.
  • 2019 : 10,000 L/hr Purified Water Storage and Distribution System.
  • 2019 : 100 kg/hr Pure Steam Distribution System.
  • 2019 : 350m Purified Water Distribution Loop c/w 11 users points.
  • 2019 : 250m WFI Distribution Loop c/w 7 users points.
  • 2019 : 200m Pure Steam Distribution Loop c/w 5 users points.
  • 2018 : 2,000 L/hr Purified Water Generation System (ROEDI) c/w fully automated HEAT Sanitization.
  • 2018 : 450m Purified Water Distribution Loop c/w 13 users points.
  • 2016 – 2017 : 5,000 L/hr Purified Water Generation System (ROEDI) c/w fully automated HEAT Sanitization.
  • 2016 – 2017 : 15,000 L/hr Purified Water Storage and Distribution System c/w fully automated HEAT Sanitization.
  • 2016 – 2017 : 500m Purified Water Distribution Loop c/w 15 user points.

Industrial Effluent Treatment System & others

  • 250 L/hr Evaporator + 1,000 L/hr Physical Treatment System (IETS plant).
  • 400m IETS Collection Loop c/w 15 user points with PVDF piping
  • 10,000 L/hr Filter Water System c/w Hardness Control and Monitoring System.
  • 800m Filter Water Distribution Loop c/w 38 user points.
  • 200m Hardness Water Distribution Loop c/w 4 user points.

Semiconductors, Chemical, Others

  • 2019 (Semiconductor) : 100 GPM ROEDI Ultrapure Water System & 150 GPM UPW PVDF Distribution Loop at:
    • > 18.0 Mohm cm.
    • < 2.0 ppb TOC
    • < 2.0 ppb Silica
    • < 100 ppb DO
    • < 10 cfu/ml
    • < 50 ppt trace metal
  • 2019 (Semiconductor): 3,600CFM with 42″ counter current packed bed acid (HCL) fume gas scrubber system c/w 100m acid fume (HCL) ducting (FM approved FRP ducting) production collection system.
  • 2019 (Glove) : 25 m3/hr IETS plant.
  • 2018 (Chemical): 5m3/hr RODI System & 5m3/hr IETS c/w heavy metal removal system and wastewater reclamation system.

Environmental Impact Assessment


Oil & Gas Sector

  1. Sarawak Shell, E11 Complex, Offshore Sarawak, South China Sea
  2. YPF Malaysia Ltd, Block SK-301 Exploratory Drilling, Offshore Sarawak.
  3. Brunei LNG, Expansion of LNG Plant, Lumut.
  4. Petronas Carigali, Miri Crude Oil Terminal (MCOT), Phase 1 Rejuvenation, Sarawak.
  5. Petronas Carigali Oversea / White Nile Petroleum Op. Co. (WNPOC), Seismic & Exploration in Block 5A, Sudan
  6. Sarawak Shell, Decommissioning of Baram 8 Offshore Wellhead Platform

Petrochemical Sector

  1. BASF Petrons Chemicals, Petrochemical Plants in Gebeng Industrial Estate.
  2. MTBE Malaysia, Propylene / N-butane Plant Modification in Gebeng.
  3. Shell Eastern Petroleum, Petrochemical Complex on Pulau Bukom, Singapore.
  4. Dialog Bhd. Langsat Terminal One and Centralized Tank Facility.

Energy & Utilities Sector

  1. TNB Generation Asset Development, 720MW Combined Cycle Power Plant in Pai, Penang
  2. 550MW Power Plant Expansion in Yanbu, Saudi Arabia for MARAFIQ Power & Desalination.
  3. 48,000 m3/day Industrial Wastewater Treatment Plant in Yanbu for MARAFIQ.

Infrastructure & Project Development Sector

  1. Beroga Sanitary Landfill, Seminyih for Worldwide Landfills & Selangor State Govt.
  2. Brunei Shell Petroleum, Muara Supply Base Jetty Relocation, Brunei
  3. Langkawi Golf, Spa & Recreational Village.

Environmental Engineering

  1. Beroga Sanitary Landfill Conceptual Design Engineering for Worldwide Landfills
  2. Conceptual Design of Integrated Waste Management Facility in Al Hasa Metropolitan, Eastern Province, Saudi Arabia
  3. Waste to Energy Plant in Jeddah for Octagon Consolidated
  4. Makkah Tunnels Assessment for Pollution and Green Technology in Makkah, Saudi Arabia for Makkah Municipality

Environmental Audit & Due Diligence

  1. Pfizer pharmaceutical facility in Singapore
  2. Seagate hard disk manufacturing sites in Penang and Singapore
  3. Offshore operation’s waste management for Talisman Malaysia
  4. KLCC Gas District Cooling for Dalkia International
  5. Nestle’s food & beverage manufacturing facilities in Selangor
  6. Lafarge Roofing GmbH, a manufacturing facility in Selangor
  7. H&R Group Australia, wax manufacturing plant.
  8. Roof tiles manufacturing factory and clay quarry for Monier Asia Pacific.

AQM Network, Air Pollution Dispersion Modelling, Greenhouse Gas (GHG) & Carbon Measurement


  1. Indonesia Ministry of Environment on National AQM network, planning and design
  2. Qatar Supreme Council for Environment & Natural Resources (SCENR) on Doha AQM Network – Gap Analysis
  3. Jeddah City Air Quality Assessment for Jeddah Municipality.
  4. Air Quality Assessment for Kuala Lumpur Motor Vehicle Emission for DOE and GTZ
  5. National Air Quality Monitoring Network in Malaysia
  6. Kaneka VCM plant, Gebeng, Malaysia
  7. Murphy Oil, oil & gas production, offshore Sarawak
  8. Power Seraya, Singapore.
  9. Odour Modelling, Beroga Sanitary Landfill.
  10. Power Plant Complex at Phu My3, Vietnam
  11. Gas Separtion Plant at Songkhla, Thailand
  12. MARAFIQ Power Plant, Yanbu, Saudi Arabia

Designed with pharmaceutical, GMP, and GAMP compliances.


NPR – National Pharmaceutical Regulatory Agency

USP – United States Pharmacopeia
FDA – U.S. Food and Drug Administration

TGA – Therapeutic Goods Administration

BP British Pharmacopoeia

Ph. Eur. – European Pharmacopoeia